“How soon can you do it?” is usually the second question, right after price. Here are the real timelines we work to, and the few things that stretch them.
What are typical lead times by project?
Showers and mirrors: measure within a week, glass ready in 10–15 business days, install in a half day. Table tops and shelves: often one to two weeks total. Railings: two to four weeks, longer for laminated. Wine rooms and office systems: three to five weeks including hardware lead times.
Why does tempered glass take so long?
Every panel is cut, edged, drilled and polished first, then heat-treated in a tempering furnace — and nothing can be changed after that step. Fabricators batch furnace runs, so your panel queues with others. Laminated glass adds a second process on top.
What causes delays?
Honestly: site readiness (tile not finished, walls not painted), special-order hardware finishes, and mid-project design changes — after tempering, a change means a new panel. Our advice: finalize tile and hardware decisions before we template.
Can a job be rushed?
Sometimes — simple panels can occasionally move through fabrication in days for a rush fee. What we won’t rush is the measure: an hour saved templating is how projects lose two weeks to a re-cut.
The fix for lead time is simply starting early: book the measure as soon as your tile date is on the calendar, and your glass will be waiting for the bathroom — not the other way around.